Tavistock

In this 60 lot residential subdivision servicing project, Musselman Excavating installed 600m of concrete storm pipe and 250m of deep sanitary pipe through a tight area which backs into existing home lots, all in high water table conditions. Shored connections to the pumping station were also installed by Musselman, at a depth of 9m. 

9EFA45BA-6557-4988-9839-062D5FF738FE.heic
Screen Shot 2021-09-15 at 11.15.42 AM.png